PROJECTS · 2022—PRESENT

Selected work

01
AUG — DEC 2024
SAN JOSÉ STATE

Space System Engineer, Mars Nodes PCB Project

A sensor node built for extreme environments. I tested it in a vacuum chamber and at room temperature to verify it still worked.

THERMAL VACUUM TESTRan vacuum chamber and room-temperature functional tests of the sensor.
DATA ANALYSISAnalyzed temperature, signal strength and solar power regulation data.
ASSEMBLYAssembled the PCB using reflow soldering.
SAFETYFollowed strict ESD and lab protocols: wrist straps and workstation grounding.
02
SEP — DEC 2024
NASA · VIRTUAL

Thermal Engineer, NASA Mission Concept Academy

Competition mission-concept work on lunar cave exploration, covering the thermal subsystem, site selection and a rover component in CAD.

CERTIFIEDHeat transfer, Siemens NX and systems engineering fundamentals.
SITE SELECTIONEvaluated lunar cave and pit sites in JMARS mapping software.
CADHelped design part of an RC rover in Siemens NX.
03
AUG 2024 — MAY 2025
SAN JOSÉ STATE

Mechanical CAD Engineer, Senior Project

A fixed-wing surveillance aircraft, designed and integrated as a team, that met its requirements of stable flight at 400 ft and 30 minutes of endurance.

FEAUsed ANSYS to optimize structure and aerodynamics, cutting tail connector weight by 40%.
INTEGRATIONIntegrated and verified aileron, elevator and rudder actuation with the flight controller.
ITERATION3D-printed PETG connector and ASA winglets over multiple iterations.
04
ONGOING
PERSONAL

Automotive Repair & Maintenance

I diagnose and repair faults on my own vehicles, end to end.

COOLING SYSTEMCoolant replacement.
SUSPENSIONControl arm replacement.
05
AUG — DEC 2025
SAN JOSÉ STATE

Lathe & Mill Operator, Machine Shop

Machined parts on manual mills and lathes from engineering drawings, then checked dimensions against tolerance with calipers and micrometers.

06
OCT — DEC 2022
SAN JOSÉ STATE

Mechanical Design Engineer, Robot Project

Assembled the drive system, claw, bumper switches and arm for a 1.6 kg robot, then tested and refined it until it completed all four tasks in about 43 seconds.